11/6/14 - Painters were back today to finish the internal painting. The have also fixed the returns on the external render to reflect our plans.



12/6/14 - Stone benchtops were installed today, look forward to seeing them without all the plastic on them.





13/6/14 - Air conditioner was installed today along with the vents inside the house and the power panel


16/6/14 - Tiler was back today to finish off the splashbacks, and from all the empty boxes sitting on top of the skip bin it looks like the appliances have been installed as well.

17/6/14 - Big day at the house today with the plumbing fit out started and completed! The gas system was installed, along with mirrors, ensuite shower screen, bath tub and toilets. The electrical fit out was also started, the downlights that we got as part of the birthday package were installed, along with the under bench downlights, power points and light switches, and data points. Still looks like there are a few baton lights that need to be installed where we will be swapping out to downlights ourselves after handover. The back door was left unlocked today so was able to pop in and take a few pictures, noticed that our powder room splash back tiles are wrong - they have used our bathroom wall tiles instead of our laundry tiles - will have to point this out at PCI , I dont think it will be to hard to rectify. Also got to have a good look at our benchtops, and I love them. Love the Pete Evans undermount sick! Its really coming together and I'm really happy with our selections so far.

Main Bathroom





Laundry



Outside (downpipe, powerpoints, drains etc)






 

Rumpus Room


Kitchen







Ensuite




Powder Room (wrong splashback tiles)

 














No comments:

Post a Comment